Processes for project-oriented job-site management

  • US 20070124000A1
  • Filed: 11/30/2005
  • Published: 05/31/2007
  • Est. Priority Date: 11/30/2005
  • Status: Abandoned Application
First Claim
Patent Images

1. A system for managing a project environment including a work machine performing operations associated with a project included in the project environment, the system comprising:

  • a project management system configured to;

    store a first set of project specifications for the project in a storage device, receive operation data from the work machine reflecting the operations of the work machine, analyze the operation data to determine the status of the work machine, generate a second set of project specifications based on the status of the work machine; and

    a project subscriber configured to receive the second set of project specifications from the project management system and determine an action to be taken with the work machine based on the status of the work machine, wherein the project management system provides a command to the work machine for adjusting the operations of the work machine associated with the project based on the second set of project specifications and the determined action.

View all claims