×

Recovery and debugging of failed network-accessible service construction

  • US 20070168691A1
  • Filed: 11/29/2005
  • Published: 07/19/2007
  • Est. Priority Date: 11/29/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • in response to determining that computer generation of an abstract workflow plan for a network-accessible service resulted in a failure, attempting to automatically recover from the failure without human intervention;

    where attempting to automatically recover from the failure of the computer generation of the abstract workflow plan is unsuccessful, applying a plurality of plan selection failure remedy rules, with human intervention, to assist in debugging the failure of the computer generation of the abstract workflow plan;

    in response to determining that computer assignment of a physical plan for the abstract workflow plan resulted in a failure, attempting to automatically recover from the failure without human intervention;

    where attempting to automatically recover from the failure of the computer assignment of the physical plan for the abstract workflow plan is unsuccessful, applying a plurality of plan assignment failure remedy rules, with human intervention, to assist in debugging the failure of the computer assignment of the physical plan;

    in response to determining that computer evaluation of a runtime configuration for the physical plan resulted in a failure, attempting to automatically recover from the failure without human intervention; and

    , where attempting to automatically recover from the failure of the computer evaluation of the runtime configuration for the physical plan is unsuccessful, applying a plurality of runtime evaluation failure remedy rules, with human intervention, to assist in debugging the failure of the computer evaluation of the runtime configuration.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×