Method and system for managing material movement and inventory
First Claim
1. A method comprising:
- entering input data into a computer program including at least one of item number, manufacturing cost, material demand, supplier site, shipping frequency, transit time, and container cost, determining material management costs for a plurality of shipment options, and outputting from the computer program at least one of a first set of material management data based on the input shipping frequency and at least one of a second set of material management data based on an optimized shipping frequency of full inbound containers.
1 Assignment
0 Petitions
Accused Products
Abstract
A method is provided that involves entering input data into a computer program including at least one of item number, manufacturing cost, material demand, supplier site, shipping frequency, transit time, and container cost, determining material management costs for a plurality of shipment options, and outputting from the computer program at least one of a first set of material management data based on the input shipping frequency and at least one of a second set of material management data based on an optimized shipping frequency of full inbound containers. A corresponding system is also disclosed. The method and system are useful for managing material movement and inventory.
21 Citations
20 Claims
-
1. A method comprising:
-
entering input data into a computer program including at least one of item number, manufacturing cost, material demand, supplier site, shipping frequency, transit time, and container cost, determining material management costs for a plurality of shipment options, and outputting from the computer program at least one of a first set of material management data based on the input shipping frequency and at least one of a second set of material management data based on an optimized shipping frequency of full inbound containers. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)
-
- 17. A system comprising a computer having a memory containing standard data, a processor configured to determine material management costs for a plurality of shipment options, and software that generates an input form configured to receive material management data for an item to be shipped and an output form that provides at least one of a first set of material management data based on a preferred shipping frequency and at least one of a second set of material management data based on an optimized shipping frequency of full inbound containers.
-
19. A method comprising:
-
entering input data into a computer program including item number, manufacturing cost, material demand, supplier site, shipping frequency, transit time, and container cost, determining material management costs for a plurality of shipment options involving shipping containers of material to a first location and subsequently shipping a portion of the material to a second location, and outputting from the computer program a first set of material management data based on the input shipping frequency and a second set of material management data based on an optimized shipping frequency of full inbound containers, and selecting a shipping method based upon review of the first and second sets of material management data. - View Dependent Claims (20)
-
Specification