×

Boiler control unit

  • US 20070215340A1
  • Filed: 09/08/2005
  • Published: 09/20/2007
  • Est. Priority Date: 09/30/2004
  • Status: Active Grant
First Claim
Patent Images

1. Boiler control unit for controlling a heating device in a boiler, comprising a delayed cycle controller for activating and deactivating said heating devices, wherein said delayed cycle controller is operated by a thermal relay, providing a temperature responsive signal which is switched on when the temperature in the boiler underpasses a lower temperature level and switched off when the temperature in the boiler exceeds a higher temperature level, and wherein said delayed cycle controllers is arranged to determine the cooling time (□

  • 2



    1) of the boiler by measuring the time elapsing between the on-to-off transition (□

    1) and the off-to-on transition (□

    2) of the signal provided by the thermal relay, to determine a delay as a certain percentage of said cooling time (□

    2



    1), to deactivate the heating device essentially at the point of time when the thermal relay signal is switched off, and to activate the heating device at a point of time (□

    3) given by said delay after the off-to-on transition (□

    2) of the signal provided by the thermal relay, said boiler control unit further comprising an input of a signal from a temperature sensor which is arranged to measure the boiler outlet temperature, said percentages being dynamically variable, dependent on the signal from said temperature sensor.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×