×

OVERHEAD POWER TRANSMISSION LINE CONDUCTOR SELECTION

  • US 20070271081A1
  • Filed: 05/19/2006
  • Published: 11/22/2007
  • Est. Priority Date: 05/19/2006
  • Status: Active Grant
First Claim
Patent Images

1. A computer-implemented method of evaluating an electric conductor for an overhead power transmission line, comprising:

  • receiving requirements data defining requirements for an overhead power transmission line comprising at least a span value, a maximum sag value, and a maximum tension value;

    receiving conductor data that define at least two conductors to be evaluated;

    after receiving conductor data for the plurality of conductors to be evaluated, automatically modeling expected operating performance for at least two conductors using conductor assessment software running on a computer, wherein modeling at least comprises, for at least one of the conductors to be evaluated, calculating the conductor'"'"'s maximum ampacity within the constraints defined by the requirements data; and

    ,based on the modeling, identifying at least one conductor that meets the requirements for the power transmission line using the conductor assessment software.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×