System and method for automated management of replacement building projects in a disaster relief area

  • US 20070288269A1
  • Filed: 03/28/2007
  • Published: 12/13/2007
  • Est. Priority Date: 03/29/2006
  • Status: Abandoned Application
First Claim
Patent Images

1. A method for using a database to rebuild a damaged or destroyed building, the method comprising:

  • receiving from a user contact information representing a party owning the damaged or destroyed building, and storing the contact information in the database;

    receiving from the user pre-damaged discovery information representing features of the damaged or destroyed building and features of a building site of the damaged or destroyed building, and storing the pre-damaged discovery information in the database;

    receiving from the user replacement building information representing features for a replacement building that correspond with the damaged or destroyed building, and storing the replacement building information in the database;

    receiving from the user foundation upgrade information representing a modification to the building site in case the party desires to modify the building site, and storing the foundation upgrade information in the database;

    receiving from the user site inspection information representing observations made during a physical inspection of the building site of the damaged or destroyed building, and storing the site inspection information in the database;

    receiving from the user financial information representing the financial status of the party and storing the financial information in the database;

    modifying the replacement building information in the database representing a modified replacement building as a function of the foundation upgrade information, the site inspection information, and the financial information;

    generating replacement building plan requirements as a function of the modified replacement building information; and

    automatically generating a binding sales contract for the party and a builder for the replacement building.