Systems and methods for generating a work schedule
First Claim
Patent Images
1. A method for generating a work schedule, comprising the acts of:
- receiving an identification of a number of work periods and a plurality of tasks;
receiving information for a plurality of workers related to the plurality of tasks;
receiving a parameter for optimization; and
outputting a work schedule distributing the plurality of workers into the plurality of tasks for each of the number of work periods, wherein the work schedule is optimized for the parameter.
1 Assignment
0 Petitions
Accused Products
Abstract
Systems and methods for generating work schedules are provided. Work schedules are generated based on an identification of work periods and tasks and information related to the workers. A work schedule is produced based on a selected optimization parameter. The optimization parameter can be any type of parameter related to the tasks and workers. The optimization parameter can be ergonomic impact, level of training, experience level or the like. The systems and methods can also receive assigned tasks for one or more of the workers, and generate a schedule incorporating the assignments.
18 Citations
29 Claims
-
1. A method for generating a work schedule, comprising the acts of:
-
receiving an identification of a number of work periods and a plurality of tasks; receiving information for a plurality of workers related to the plurality of tasks; receiving a parameter for optimization; and outputting a work schedule distributing the plurality of workers into the plurality of tasks for each of the number of work periods, wherein the work schedule is optimized for the parameter. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15)
-
-
16. A processor comprising:
-
logic for receiving an identification of a number of work periods and a plurality of tasks; logic for receiving information for a plurality of workers related to the plurality of tasks; logic for receiving a parameter for optimization; and logic for outputting a work schedule distributing the plurality of workers into the plurality of tasks for each of the number of work periods, wherein the work schedule is optimized for the selected parameter. - View Dependent Claims (17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29)
-
Specification