×

OPTIMIZED MULTI-COMPONENT CO-ALLOCATION SCHEDULING WITH ADVANCED RESERVATIONS FOR DATA TRANSFERS AND DISTRIBUTED JOBS

  • US 20070294408A1
  • Filed: 06/14/2007
  • Published: 12/20/2007
  • Est. Priority Date: 06/15/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method of establishing a schedule for processing a job in a compute environment, the method comprising:

  • converting a topology of a compute environment to a plurality of endpoint-to-endpoint paths;

    based on the plurality of endpoint-to-endpoint paths, mapping each replica resource of a plurality of resources to one or more endpoints where each respective resource is available;

    iteratively identifying schedule costs associated with a relationship between endpoints and resources; and

    committing a selected schedule cost from the identified schedule costs for processing a job in the compute environment.

View all claims
  • 8 Assignments
Timeline View
Assignment View
    ×
    ×