System and method of multi-generation positive train control system
First Claim
Patent Images
1. A method of predicting the performance of the movement of trains over a rail network comprising the steps of:
- (a) generating a movement plan for a first train;
(b) assigning a crew to operate the first train;
(c) monitoring the performance of the movement of the first train against the movement plan as a function of the assigned crew;
(d) monitoring conditions of the railway;
(e) storing information related to the monitored performance and the monitored conditions of the railway;
(f) predicting the performance of the movement of a second train as a function of the stored information.
1 Assignment
0 Petitions
Accused Products
Abstract
A method of scheduling the movement of trains as a function of the predicted crew behavior and predicted rail conditions.
96 Citations
9 Claims
-
1. A method of predicting the performance of the movement of trains over a rail network comprising the steps of:
-
(a) generating a movement plan for a first train; (b) assigning a crew to operate the first train; (c) monitoring the performance of the movement of the first train against the movement plan as a function of the assigned crew; (d) monitoring conditions of the railway; (e) storing information related to the monitored performance and the monitored conditions of the railway; (f) predicting the performance of the movement of a second train as a function of the stored information. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A method of scheduling the movement of plural trains over a rail network, each train having an assigned crew to operate the train comprising the steps of:
-
(a) maintaining a database of information related to the past performance of the movement of a first train as a function of the crew assigned to operate the first train; and (b) scheduling the movement of a second train as a function of the information in the database. - View Dependent Claims (8, 9)
-
Specification