×

SYSTEM AND METHOD FOR OPERATIONAL MANAGEMENT OF A GUARDED PROBE FOR FORMATION FLUID SAMPLING

  • US 20080073078A1
  • Filed: 09/22/2006
  • Published: 03/27/2008
  • Est. Priority Date: 09/22/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method for managing sampling of formation fluids from an earth formation surrounding a wellbore using a guarded sampling probe, comprising:

  • lowering a wellbore tool coupled with guarded sampling probe into the wellbore, the guarded sampling probe comprising a sampling probe and a guard probe;

    withdrawing fluids from the earth formation using guarded sampling probe, wherein a single flowline is coupled with the sampling probe and the guard probe to provide for the withdrawal of the fluids from the earth formation through the guarded sampling probe;

    sensing one or more properties of the withdrawn fluids;

    processing the one or more properties of the withdrawn fluid; and

    splitting the single flowline system into a sampling flowline and a guard flowline.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×