×

Computer system, changeover-to-backup-system method, changeover-to-backup-system program, monitoring device, terminal device and backup system

  • US 20080082858A1
  • Filed: 08/03/2007
  • Published: 04/03/2008
  • Est. Priority Date: 09/29/2006
  • Status: Active Grant
First Claim
Patent Images

1. A computer system comprising:

  • a terminal device;

    a main system providing a management service to said terminal device registered in management information;

    a backup system standing by for continuing to provide the management service in case of occurrence of a fault in the main system; and

    a monitoring device monitoring an operation status of said main system,said monitoring device including;

    a monitoring unit transmitting a status check to said main system and receiving a response transmitted from said main system in response to the status check, thus monitoring a normal operation of said main system;

    a fault detecting unit determining, if unable to receive the response to the status check under a predetermined condition, that the fault occurs in said main system; and

    a startup request transmitting unit transmitting, if said fault detecting unit determines that the fault occurs, a management service startup request to said backup system,said terminal device including;

    a registration request unit transmitting the registration request for registering in the management information to said main system or said backup system, receiving registration completed notification sent from said backup system in response to the registration request, transmitting the registration request preferentially to said main system, and transmitting, if not receiving the registration completed notification to the registration request under a predetermined condition, the registration request to said backup system,said backup system including;

    a management service startup unit standing by in a status of not registering said terminal device in the management information even when receiving the registration request, starting providing the management service by starting up the management service when receiving the startup request, and starting the registration in the management information in response to the registration request.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×