×

OILFIELD MANAGEMENT SYSTEM

  • US 20080126168A1
  • Filed: 11/14/2007
  • Published: 05/29/2008
  • Est. Priority Date: 11/15/2006
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of managing an oilfield activity for an oilfield having at least one processing facility and at least one wellsite operatively connected thereto, each at least one wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein, comprising:

  • identifying a problem in the oilfield activity,wherein the oilfield activity comprises a plurality of tasks necessary to complete a first project of a plurality of projects in a workflow, andwherein the plurality of tasks are arranged within a plurality of workflow states associated with the oilfield activity;

    selectively updating a sequence for the plurality of tasks based on an analysis of the oilfield activity performed by a first user;

    analyzing the first project by examining a progress of the first project within one of the plurality of workflow states to obtain a decision, wherein the first project is associated with the problem; and

    resolving the problem in the oilfield activity based on the decision.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×