×

SYSTEM AND METHOD FOR RESOURCE MANAGEMENT

  • US 20080172312A1
  • Filed: 09/25/2007
  • Published: 07/17/2008
  • Est. Priority Date: 09/25/2006
  • Status: Active Grant
First Claim
Patent Images

1. A intelligent controller for managing use of a consumable resource at an associated load, comprising:

  • a load resource measuring component for measuring the rate of use of the resource by the associated load, including measuring at least one of an instantaneous usage rate and a usage rate over an integration period;

    a load status component for receiving load status data for the associated load;

    a communication component for receiving control messages from and sending load status messages to other associated controllers;

    a memory for storing a load operating plan and a load control goal set; and

    a load control computer program responsive to the load resource measuring component, the load status component, the control messages from other associated controllers, the load operating plan and the load control goal set, to determine a load operating level for, and provide control commands to, the associated load.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×