METHOD AND COMPUTER SOFTWARE CODE FOR IMPLEMENTING A REVISED MISSION PLAN FOR A POWERED SYSTEM
First Claim
Patent Images
1. A method for determining when to request a revised mission plan from a computer-readable instruction that when executed by a processor cause the processor to generate a mission plan for a powered system, the method comprising:
- identifying whether a mission plan request is at least one of a mandatory mission plan request, an optional mission plan request, and a confirmation required mission plan request which may replace a current mission plan.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for determining when to request a revised mission plan from a computer-readable instruction that when executed by a processor cause the processor to generate a mission plan for a powered system, the method including identifying whether at least one revised mission plan request is a mandatory mission plan request, an optional mission plan request, and/or a confirmation required mission plan request which may replace a current mission plan.
-
Citations
40 Claims
-
1. A method for determining when to request a revised mission plan from a computer-readable instruction that when executed by a processor cause the processor to generate a mission plan for a powered system, the method comprising:
identifying whether a mission plan request is at least one of a mandatory mission plan request, an optional mission plan request, and a confirmation required mission plan request which may replace a current mission plan. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31)
-
32. A computer software code operable within a processor and configured to reside on a computer readable media for determining when to request a revised mission plan from a computer-readable instruction that when executed by the processor cause the processor to generate a mission plan for a powered system, the computer software code comprising:
computer software module for identifying whether at least one revised mission plan request is at least one of a mandatory mission plan request, an optional mission plan request, and a confirmation required mission plan request which may replace a current mission plan. - View Dependent Claims (33, 34, 35, 36, 37, 38, 39, 40)
Specification