×

Train Integrity Network System

  • US 20080195265A1
  • Filed: 05/03/2005
  • Published: 08/14/2008
  • Est. Priority Date: 05/03/2004
  • Status: Abandoned Application
First Claim
Patent Images

1. A train integrity network system comprising two or more bogie units which monitor critical parameters relating to the condition of bogie components and the rail track they are travelling on, an onboard server which controls the bogie units and a wireless network which enables communication between the server and the bogie units.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×