Tension Monitoring Arrangement and Method

  • US 20080215258A1
  • Filed: 01/22/2008
  • Published: 09/04/2008
  • Est. Priority Date: 05/24/2002
  • Status: Active Grant
First Claim
Patent Images

1. In a system for installing an underground utility by retraction that is applied to a leading end of the utility to draw the utility through the ground such that the utility is subjected to a tension force, said system including an inground tension monitoring arrangement having a processing arrangement which receives electrical power from a power supply in a way which may subject the processing arrangement to a loss of power that is temporary during system operation, as well as a shut-down loss of power condition, either of which causes the processing arrangement to reset, an apparatus comprising:

  • a first arrangement for producing an output signal that is responsive to a time duration of the loss of power; and

    a second arrangement, cooperating with said processing arrangement, for using said output signal to establish whether a particular reset is responsive to a power supply bounce condition during operation.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×