Operating System of Constrution Machinery
First Claim
1. An operating system for a construction machine comprising:
- setting means (36) for setting a target value with respect to a frequency distribution of a prescribed state value relating to an operational condition of the construction machine;
detecting means for detecting a prescribed state value; and
control means (35) for calculating the frequency distribution of said prescribed state value detected by said detecting means, comparing said frequency distribution thus calculated with said target value set by said setting means (36), and outputting a previously prepared message in accordance with the comparison result.
1 Assignment
0 Petitions
Accused Products
Abstract
The operating system for a construction machine gives advice on efficient operation to an operator. A specified state value relating to the operational condition of the construction machine, for example, the hydraulic oil pressure or engine speed, is detected (S101), and the frequency distribution of the state value in prescribed time intervals is calculated (S102). The variable range of the state value is classified into plural regions beforehand, and different target values are pre-set for each these regions. For each region, the frequency distribution is compared with the target value (S104, 106, 108, 110, 112), and as a result of the comparison, a applicable message is selected from the prescribed messages and output (S105, 107, 109, 111, 113). The output message may also be selected according to the combination of the comparison results for the plural state values such as the hydraulic oil pressure and engine speed.
26 Citations
16 Claims
-
1. An operating system for a construction machine comprising:
-
setting means (36) for setting a target value with respect to a frequency distribution of a prescribed state value relating to an operational condition of the construction machine; detecting means for detecting a prescribed state value; and control means (35) for calculating the frequency distribution of said prescribed state value detected by said detecting means, comparing said frequency distribution thus calculated with said target value set by said setting means (36), and outputting a previously prepared message in accordance with the comparison result. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. An operating system for a construction machine comprising:
-
setting means (36) for setting a target value with respect to a frequency of a workless state of the construction machine; detecting means for detecting a workless state during a period that an engine of said construction machine is operated; and control means (35) for calculating a frequency of said workless state detected by said detecting means, comparing the frequency of said workless state thus calculated with said target value set by said setting means, and outputting a previously prepared message in accordance with the comparison result. - View Dependent Claims (14, 15)
-
-
16. An operational control method comprising the steps of:
-
setting a target value with respect to a frequency distribution of a prescribed state value relating to an operational condition of a construction machine; detecting a prescribed state value; calculating the frequency distribution of said detected prescribed state value, comparing said calculated frequency distribution with said set target value, and outputting a previously prepared message in accordance with the comparison result.
-
Specification