Method for Manufacturing With Engineering Change Override
0 Assignments
0 Petitions
Accused Products
Abstract
The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for processing orders. A request for delivery by a requested delivery date is received for an order having an original delivery date. The ordered product is broken down into one or more materials required for manufacturing the ordered product. For at least one material required for manufacturing the ordered product, a date when an engineering change becomes effective for the material is specified. An alternate bill of materials is created based on the specified date when the engineering change becomes effective for the material. An alternate manufacturing plan based on the alternate bill of materials is created. Manufacturing is initiated based on the alternate manufacturing plan. If manufacturing can be completed in time for delivery by the requested delivery date, the original delivery date of the order is replaced with the requested delivery date.
21 Citations
31 Claims
-
1-9. -9. (canceled)
-
10. A computer program product comprising stored in a computer usable medium including computer usable program code when executed by a computer for processing orders, said computer program product comprising:
-
computer usable program code for receiving a request for delivery of an order by a requested delivery date; computer usable program code, responsive to receiving the request for delivery of the order by the requested delivery date, for specifying a date when an engineering change becomes effective for at least one material required for the order outside of a material requirements planning system, wherein the specified date when the engineering change becomes effective for the at least one material is the date when a manufacturing operation changes from the at least one material to a different version of the at least one material based on factors not accounted for by a current date when the engineering change becomes effective for the at least one material, and wherein the specified date when the engineering change becomes effective for the at least one material is specified manually or programmatically for overriding the current date; computer usable program code for creating an alternate bill of materials based on the specified date when the engineering change becomes effective; computer usable program code for creating an alternate manufacturing plan based on an alternate bill of materials for delivery of the order by the requested delivery date; and computer usable program code for initiating the manufacturing operation based on the alternate manufacturing plan. - View Dependent Claims (11, 12, 13, 14, 15, 16, 18)
-
-
17. (canceled)
-
19. A data processing system for processing orders, the data processing system comprising:
-
receiving means for receiving a request for delivery of an order by a requested delivery date; specifying means, responsive to receiving the request for delivery of the order by the requested delivery date, for specifying a date when an engineering change becomes effective for at least one material required for the order outside of a material requirements planning system, wherein the specified date when the engineering change becomes effective for the at least one material is the date when a manufacturing operation changes from the at least one material to a different version of the at least one material based on factors not accounted for by a current date when the engineering change becomes effective for the at least one material, and wherein the specified date when the engineering change becomes effective for the at least one material is specified manually or programmatically for overriding the current date; first creating means for creating an alternate bill of materials based on the specified date when the engineering change becomes effective; second creating means for creating an alternate manufacturing plan based on an alternate bill of materials for delivery of the order by the requested delivery date; and initiating means for initiating the manufacturing operation based on the alternate manufacturing plan. - View Dependent Claims (20, 21, 22, 23, 24, 25, 27)
-
-
26. (canceled)
-
28. An apparatus for processing orders, the apparatus comprising:
-
an order management component for receiving a request for delivery of an order by a requested delivery date; a material requirements planning component, responsive to receiving the request for delivery of the order by the requested delivery date, for specifying a date when an engineering change becomes effective for at least one material required for the order outside of the material requirements planning component, wherein the specified date when the engineering change becomes effective for the at least one material is the date when a manufacturing operation changes from the at least one material to a different version of the at least one material based on factors not accounted for by a current date when the engineering change becomes effective for the at least one material, and wherein the specified date when the engineering change becomes effective for the at least one material is specified manually or programmatically for overriding the current date, for creating an alternate bill of materials based on the specified date when the engineering change becomes effective, for creating an alternate manufacturing plan based on the alternate bill of materials for delivery of the order by the requested delivery date; and a manufacturing component for initiating the manufacturing operation based on the alternate manufacturing plan. - View Dependent Claims (29, 30)
-
-
31-33. -33. (canceled)
Specification