×

WELL PROG EXECUTION FACILITATION SYSTEM AND METHOD

  • US 20080281525A1
  • Filed: 05/10/2007
  • Published: 11/13/2008
  • Est. Priority Date: 05/10/2007
  • Status: Active Grant
First Claim
Patent Images

1. A prog analysis and execution system, comprising:

  • a computer control system;

    an interface engine in communication with the computer control system, the interface engine being configured to receive prog information;

    an action item development engine in communication with the computer control system, the action item development engine being configured to analyze received prog information and to determine corresponding action and response items;

    a sensor engine in communication with the computer control system, the sensor engine being configured to receive input from at least one sensor for use in controlling a well drilling operation; and

    an operational equipment engine in communication with the computer control system, the operational equipment engine being configured to receive input from the computer control system and to control the well drilling operation in accordance with determined action items in the prog.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×