Please download the dossier by clicking on the dossier button x
×

Method to imporove the performance of a distrubuted scheduler

  • US 20090005895A1
  • Filed: 06/24/2008
  • Published: 01/01/2009
  • Est. Priority Date: 06/28/2007
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of improving a performance of a distributed scheduler for a manufacturing process comprising activities including a production resource management, a production definition management, and a detailed production scheduling, the method comprising:

  • providing a decision and prediction function over the activities which carries out an analysis of a variability of the manufacturing process; and

    taking results of said analysis into account while making an actual detailed schedule in the production scheduling.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×