1. Computer apparatus for managing engineering product revisions, comprising:
- a repository holding one or more assets, for each asset the repository holding respective revisions of the asset, different assets forming different engineered products; and
a revision manager tracking changes of state made to assets of the repository, each change of state made to a given asset resulting in a respective revision of the given asset, the revision manager providing a project view illustrating changes of state of assets, the project view including performance indicators corresponding to respective changes of state of assets held in the repository.
1 Assignment
0 Petitions
Accused Products
Abstract
Computer method and apparatus managing engineering product revisions. A repository holds one or more assets. For each asset, the repository holds respective revisions of the asset. A revision manager tracks changes of state of assets of the repository. Each change of state of a given asset results in a respective revision of the given asset. The revision manager provides a project view illustrating changes of state of assets and including performance indicators corresponding to respective changes of state of assets held in the repository. The performance indicators may be color coded and may be based on a changeable metric. The revision manager provides in the project view an indication of each change in metric. Plural performance indicators for a set of assets may be presented in the project view as a graphical series.
-
Citations
20 Claims
-
1. Computer apparatus for managing engineering product revisions, comprising:
-
a repository holding one or more assets, for each asset the repository holding respective revisions of the asset, different assets forming different engineered products; and a revision manager tracking changes of state made to assets of the repository, each change of state made to a given asset resulting in a respective revision of the given asset, the revision manager providing a project view illustrating changes of state of assets, the project view including performance indicators corresponding to respective changes of state of assets held in the repository. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A computer implemented method for managing engineered product revisions comprising the steps of:
-
holding one or more assets in a repository, for each asset, holding respective revisions of the asset in the repository, different assets forming different engineered products; tracking changes of state made to assets of the repository, each change of state made to a given asset resulting in a respective revision of the given asset; and generating a project view illustrating changes of state of assets, the project view including performance indicators corresponding to respective changes of state of assets. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
-
15. In a system for managing engineering product revisions, computer apparatus comprising:
-
given a repository holding one or more assets, for each asset the repository holding respective revisions of the asset, different assets forming different engineered products; revision means for tracking changes of state made to assets of the repository, each change of state made to a given asset resulting in a respective revision of the given asset; and means for illustrating changes of state of assets in response to the revision means, said illustrating means generating a project view having performance indicators corresponding to respective changes of state of assets held in the repository. - View Dependent Claims (16, 17, 18, 19, 20)
-