1. A method of optimizing generated power output of a power generation system, the method comprising the steps of:
- 1) providing a source of power;
2) providing a load that consumes system generated power out;
3) providing a controller configured to employ the following steps;
a. providing one or more power transfer parameters operatively connected and responsive to said power generation system that may be applied to the system, selected for optimization and optimized by said controller;
b. selecting one power transfer parameter for optimization;
c. optimizing power generation system power output by increasing or decreasing the selected power transfer parameter as required to maximize system power output based on the power generating system'"'"'s power output measurements;
a “
load optimizing system”
operatively connected and responsive to said controller.
0 Assignments
0 Petitions
Accused Products
Abstract
A method and device for optimizing power output of a power generation system having a load engaging system, a load optimizing system, a load selection system, a motive driver and one or more loads or power transfer parameters. The power generation system is configured using an electrical generator to consume system power out. The load engaging system decides when and how the load or power transfer parameters are applied to and removed from the system. The load selection system enables multiple power transfer parameters to be optimized by selecting and isolating one power transfer parameter at a time to be optimized. The load optimizing system optimizes system power output by manipulating the selected power transfer parameter, dynamically in response to change in power output.
-
Citations
23 Claims
-
1. A method of optimizing generated power output of a power generation system, the method comprising the steps of:
-
1) providing a source of power; 2) providing a load that consumes system generated power out; 3) providing a controller configured to employ the following steps; a. providing one or more power transfer parameters operatively connected and responsive to said power generation system that may be applied to the system, selected for optimization and optimized by said controller; b. selecting one power transfer parameter for optimization; c. optimizing power generation system power output by increasing or decreasing the selected power transfer parameter as required to maximize system power output based on the power generating system'"'"'s power output measurements;
a “
load optimizing system”
operatively connected and responsive to said controller. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. A controller device optimizing generated power output of a power generation system comprising the following:
-
1) a device that may apply, remove and select one or more power transfer parameters that are operatively connected and responsive to said power generation system, and are optimized by said controller device; 2) a device that selects one power transfer parameter for optimization operatively connected and responsive to said controller device; 3) a power generating system optimizing device that increases system power output by increasing or decreasing the selected power transfer parameter as required to maximize system power output based on the power generating system'"'"'s power output measurements;
a “
load optimizing system”
operatively connected and responsive to said controller device. - View Dependent Claims (14, 15, 16, 17, 18, 19, 20, 21, 22, 23)
-
Specification