Method and System for Efficient Cost and Resource Management Using Predictive Techniques
First Claim
1. A method to operate a load, comprising the steps of:
- determining cost data for a resource of the load;
forming a regression analysis based on the cost data and other data;
generating usage bands based on the cost data and regression analysis;
generating a plurality of tasks to correspond to the usage bands;
executing the task to control the resource based upon a current cost and the usage bands.
0 Assignments
0 Petitions
Accused Products
Abstract
A method and system to operate a load may include the steps of determining cost data for a resource of the load, forming a regression analysis based on the cost data and other data, generating usage bands based on the cost data and regression analysis, generating a plurality of tasks to correspond to the usage bands, executing the task to control the resource based upon a current cost and the usage bands. The cost may be obtained from a plurality of sources, and the cost may be obtained from a wholesale cost. The cost may be obtained from a future cost, and the cost may be an independent cost. The method and system may include generating a load weight based on a predetermined period of time, and the task may include throttling the load. The task may include purchasing additional resources, and the usage bands may include a high-cost usage band. The usage bands may include an average cost usage band, and the usage bands may include a low cost usage band.
11 Citations
20 Claims
-
1. A method to operate a load, comprising the steps of:
-
determining cost data for a resource of the load; forming a regression analysis based on the cost data and other data; generating usage bands based on the cost data and regression analysis; generating a plurality of tasks to correspond to the usage bands; executing the task to control the resource based upon a current cost and the usage bands. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A system, comprising;
-
a load to be operated by the system; a management infrastructure to be operated in accordance with the following steps; determining cost data for a resource of the load; forming a regression analysis based on the cost data and other data; generating usage bands based on the cost data and regression analysis; generating a plurality of tasks to correspond to the usage bands; executing the task to control the resource based upon a current cost and the usage bands. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20)
-
Specification