×

DETERMINATION OF FORMATION PRESSURE DURING A DRILLING OPERATION

  • US 20090139321A1
  • Filed: 11/30/2007
  • Published: 06/04/2009
  • Est. Priority Date: 11/30/2007
  • Status: Active Grant
First Claim
Patent Images

1. In a drilling operation wherein a borehole is being drilled through earth formations with a drill bit at the end of a drill string, using recirculating drilling mud that flows downward through the drill string, exits through the drill bit, and returns to the earth'"'"'s surface in the annulus between the drill string and the borehole wall, at least a portion of which has a mudcake thereon, and a surface pumping system for pumping the mud to recirculate;

  • a method for determining true formation pressure, comprising the steps of;

    providing a measurement device, having a probe, on the drill string;

    controlling the mud flow rate to obtain a first measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding first probe pressure, the pressure in the formation adjacent the mudcake;

    controlling the mud flow rate to obtain a second measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding second probe pressure, the pressure in the formation adjacent the mudcake; and

    deriving the true formation pressure from said first and second measured borehole pressures and said first and second probe pressures.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×