DETERMINATION OF FORMATION PRESSURE DURING A DRILLING OPERATION
First Claim
1. In a drilling operation wherein a borehole is being drilled through earth formations with a drill bit at the end of a drill string, using recirculating drilling mud that flows downward through the drill string, exits through the drill bit, and returns to the earth'"'"'s surface in the annulus between the drill string and the borehole wall, at least a portion of which has a mudcake thereon, and a surface pumping system for pumping the mud to recirculate;
- a method for determining true formation pressure, comprising the steps of;
providing a measurement device, having a probe, on the drill string;
controlling the mud flow rate to obtain a first measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding first probe pressure, the pressure in the formation adjacent the mudcake;
controlling the mud flow rate to obtain a second measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding second probe pressure, the pressure in the formation adjacent the mudcake; and
deriving the true formation pressure from said first and second measured borehole pressures and said first and second probe pressures.
1 Assignment
0 Petitions
Accused Products
Abstract
A drilling operation wherein a borehole can be drilled through earth formations with a drill bit at the end of a drill string, using recirculating drilling mud that flows downward through the drill string, exits through the drill bit, and returns to the earth'"'"'s surface in the annulus between the drill string and the borehole wall, at least a portion of which has a mudcake thereon, and a surface pumping system for pumping the mud to recirculate. Determining true formation pressure, including the following steps: providing a measurement device, having a probe, on the drill string; controlling the mud flow rate to obtain a first measured borehole pressure and measuring, with the probe of the measurement device, as a corresponding first probe pressure, the pressure in the formation adjacent the mudcake; controlling the mud flow rate to obtain a second measured borehole pressure and measuring, with the probe of the measurement device, as a corresponding second probe pressure, the pressure in the formation adjacent the mudcake; and deriving the true formation pressure from the first and second measured borehole pressures and the first and second probe pressures.
-
Citations
22 Claims
-
1. In a drilling operation wherein a borehole is being drilled through earth formations with a drill bit at the end of a drill string, using recirculating drilling mud that flows downward through the drill string, exits through the drill bit, and returns to the earth'"'"'s surface in the annulus between the drill string and the borehole wall, at least a portion of which has a mudcake thereon, and a surface pumping system for pumping the mud to recirculate;
- a method for determining true formation pressure, comprising the steps of;
providing a measurement device, having a probe, on the drill string; controlling the mud flow rate to obtain a first measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding first probe pressure, the pressure in the formation adjacent the mudcake; controlling the mud flow rate to obtain a second measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding second probe pressure, the pressure in the formation adjacent the mudcake; and deriving the true formation pressure from said first and second measured borehole pressures and said first and second probe pressures. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13)
- a method for determining true formation pressure, comprising the steps of;
-
14. In a drilling operation wherein a borehole is being drilled through earth formations with a drill bit at the end of a drill string, using recirculating drilling mud that flows downward through the drill string, exits through the drill bit, and returns to the earth'"'"'s surface in the annulus between the drill string and the borehole wall, at least a portion of which has a mudcake thereon, and a surface pumping system for pumping the mud to recirculate;
- a method for determining true formation pressure, comprising the steps of;
providing a measurement device, having a probe, on the drill string; controlling the mud flow rate to obtain a first measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding first probe pressure, the pressure in the formation adjacent the mudcake; controlling the mud flow rate to obtain a second measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding second probe pressure, the pressure in the formation adjacent the mudcake; controlling the mud flow rate to obtain a third measured borehole pressure, with the probe of said measurement device, as a corresponding third probe pressure, the pressure in the formation adjacent the mudcake; and deriving the true formation pressure from said first, second, and third measured borehole pressures and said first, second, and third probe pressures. - View Dependent Claims (15, 16, 17, 18, 19)
- a method for determining true formation pressure, comprising the steps of;
-
20. A method for determining true formation pressure while drilling in a subterranean environment from using recirculation fluid that flows through a drill string and a void between the drill string and a formation being drilled, the method comprising the steps of:
-
providing a measurement device, having a probe, on the drill string; providing a drill bit on a lower end of the drill string such that said measurement device is approximate the drill bit; controlling a mud flow rate with a controlling means to obtain a first measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding first probe pressure, the pressure in the formation adjacent a mudcake located approximate the void; controlling the mud flow rate to obtain a second measured borehole pressure and measuring, with the probe of said measurement device, as a corresponding second probe pressure, the pressure in the formation adjacent said mudcake; and deriving the true formation pressure from said first and second measured borehole pressures and said first and second probe pressures, wherein the derived true formation pressure is communicated to a bottom hole assembly. - View Dependent Claims (21, 22)
-
Specification