×

COMPUTER SYSTEM MANAGEMENT CENTRAL SCHEDULE FOR BUSINESS DOWNTIMES

  • US 20090144112A1
  • Filed: 11/28/2008
  • Published: 06/04/2009
  • Est. Priority Date: 11/29/2007
  • Status: Abandoned Application
First Claim
Patent Images

1. A computerized method comprising:

  • storing a plurality of entries in a downtime schedule, wherein the downtime schedule can be a central downtime schedule, residing on a managing system, or a local downtime schedule, residing on a managed system;

    synchronizing the central downtime schedule with the local downtime schedule; and

    querying the downtime schedule to retrieve downtimes of the managed system.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×