DEMAND CONTROL DEVICE
First Claim
1. A demand control device applied in a facility provided with a plurality of power-consuming appliances, the demand control device comprising:
- a unit arranged to store performance data of a power consumption integrated value for each individual environmental condition in a power database;
a predicted value calculating unit arranged to calculate a predicted value of the power consumption integrated value for each one of a plurality of demand time intervals including a current demand time interval and a predetermined number of demand time intervals subsequent to the current demand time interval based on the performance data stored in the power database at a start of the demand time interval; and
a control unit arranged to control the appliances based on the predicted value calculated by the predicted value calculating unit for each one of the plurality of demand time intervals and on a pre-set target value, wherein the control unit comprises;
a unit arranged to change, when the plurality of demand time intervals include the demand time interval in which the predicted value exceeds the target value and the demand time intervals in each of which the predicted value does not exceed the target value, and operation contents each scheduled in the demand time interval in which the predicted value exceeds the target value include the operation content whose operation time is changeable, the changeable operation time of the operation content such that the operation content whose operation time is changeable is executed in any of the demand time intervals in each of which the predicted value does not exceed the target value.
1 Assignment
0 Petitions
Accused Products
Abstract
A demand control device includes a predicted value calculating unit (21) arranged to calculate a predicted value of a power consumption integrated value for each one of a plurality of demand time intervals including a current demand time interval and a predetermined number of demand time intervals subsequent to the current demand time interval based on performance data stored in a power database (24) at the start of the demand time interval, and a control unit (21) arranged to control appliances based on the predicted value calculated by the predicted value calculating unit (21) for each one of the plurality of demand time intervals and on a pre-set target value.
-
Citations
9 Claims
-
1. A demand control device applied in a facility provided with a plurality of power-consuming appliances, the demand control device comprising:
-
a unit arranged to store performance data of a power consumption integrated value for each individual environmental condition in a power database; a predicted value calculating unit arranged to calculate a predicted value of the power consumption integrated value for each one of a plurality of demand time intervals including a current demand time interval and a predetermined number of demand time intervals subsequent to the current demand time interval based on the performance data stored in the power database at a start of the demand time interval; and a control unit arranged to control the appliances based on the predicted value calculated by the predicted value calculating unit for each one of the plurality of demand time intervals and on a pre-set target value, wherein the control unit comprises; a unit arranged to change, when the plurality of demand time intervals include the demand time interval in which the predicted value exceeds the target value and the demand time intervals in each of which the predicted value does not exceed the target value, and operation contents each scheduled in the demand time interval in which the predicted value exceeds the target value include the operation content whose operation time is changeable, the changeable operation time of the operation content such that the operation content whose operation time is changeable is executed in any of the demand time intervals in each of which the predicted value does not exceed the target value. - View Dependent Claims (2, 3, 4)
-
-
5. A demand control device applied in a facility provided with a plurality of power-consuming appliances, the demand control device comprising:
-
a unit arranged to store performance data of a power consumption integrated value for each individual environmental condition in a power database; a predicted value calculating unit arranged to calculate a predicted value of the power consumption integrated value for each one of a current demand time interval and a demand time interval subsequent to the current demand time interval based on the performance data stored in the power database at a start of the demand time interval; and a control unit arranged to control the appliances based on the predicted value calculated by the predicted value calculating unit for each one of the plurality of demand time intervals and on a pre-set target value, wherein the control unit comprises; a unit arranged to control, when the predicted value for the current demand time interval does not exceed the target value, and the predicted value for the subsequent demand time interval exceeds the target value, an operation of at least one of the appliances which are continuously operated over the both demand time intervals such that an effect of operating the appliance is higher in the current demand time interval than during a normal operation. - View Dependent Claims (6, 7, 8)
-
-
9. A demand control device applied in a facility provided with a plurality of power-consuming appliances, the demand control device comprising:
-
a unit arranged to store performance data of a power consumption integrated value for each individual environmental condition in a power database; a predicted value calculating unit arranged to calculate a predicted value of the power consumption integrated value for each one of a plurality of demand time intervals including a current demand time interval and a predetermined number of demand time intervals subsequent to the current demand time interval based on the performance data stored in the power database at a start of the demand time interval; and a control unit arranged to control the appliances based on the predicted value calculated by the predicted value calculating unit for each one of the plurality of demand time intervals and on a pre-set target value, wherein the control unit comprises; a first unit arranged to change, when the plurality of demand time intervals include the demand time interval in which the predicted value exceeds the target value and the demand time intervals in each of which the predicted value does not exceed the target value, and operation contents each scheduled in the demand time interval in which the predicted value exceeds the target value include the operation content whose operation time is changeable, the changeable operation time of the operation content such that the operation content whose operation time is changeable is executed in any of the demand time intervals in each of which the predicted value does not exceed the target value; and a second unit arranged to control, when the operation time is not changed by the first unit, the predicted value for the current demand time interval does not exceed the target value, and the predicted value for the demand time interval subsequent to the current demand time interval exceeds the target value, at least one of the appliances which are continuously operated over both the current demand time interval and the subsequent demand time interval such that an effect of operating the appliance is higher in the current demand time interval than during a normal operation.
-
Specification