×

Material handling system including dual track assembly and method of operating same

  • US 20090277747A1
  • Filed: 01/09/2009
  • Published: 11/12/2009
  • Est. Priority Date: 05/09/2008
  • Status: Active Grant
First Claim
Patent Images

1. A material handling system, comprising:

  • a first track assembly configured to transport a forward trolley along a first path;

    a second track assembly configured to transport a trailing trolley along a second path, the second path being parallel to the first path; and

    a carrier configured to support an article and having a first end pivotably supported by the forward trolley and a second end pivotably supported by the trailing trolley.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×