SYSTEM AND METHOD FOR IMPLEMENTING AND MONITORING A CYBERSPACE SECURITY ECONOMETRICS SYSTEM AND OTHER COMPLEX SYSTEMS
First Claim
1. A device for implementing an econometrics-based control system, the device comprising:
- a processor;
a memory in communication with the processor, the memory configured to store processor implementable instructions, wherein the processor implementable instructions are programmed to;
generate a stakes matrix to determine a stake at least one stakeholder has in at least one system requirements;
generate a dependency matrix to link a status of at least one component with each of the at least one system requirements;
generate an impact matrix to link a possible threat with each of the at least one components;
determine a mean failure cost as a function of the generated matrices;
analyze the mean failure cost to determine a control strategy; and
a communication component in communication with the processor and the memory, the communication component configured to communicate the control strategy to a component operable within the control system, wherein the component implements the control strategy.
3 Assignments
0 Petitions
Accused Products
Abstract
A device of implementing an econometrics-based control system. The device includes a processor, a memory in communication with the processor and configured to store processor implementable instructions. The processor implementable instructions are programmed to correlate a plurality of system requirements with each of a plurality of system stakeholders, identify a stake relating to each of the plurality of system stakeholders and the correlated plurality of system requirements such that the stake is identified by each of the plurality of system stakeholders, determining a mean failure cost as a function of the identified stake and a failure probability, and analyzing the mean failure cost to determine a control strategy. The device may further comprise a communication component in communication with the processor and the memory, the communication component configured to communicate the control strategy to a component operable within the control system such that the component implements the control strategy.
-
Citations
12 Claims
-
1. A device for implementing an econometrics-based control system, the device comprising:
-
a processor; a memory in communication with the processor, the memory configured to store processor implementable instructions, wherein the processor implementable instructions are programmed to; generate a stakes matrix to determine a stake at least one stakeholder has in at least one system requirements; generate a dependency matrix to link a status of at least one component with each of the at least one system requirements; generate an impact matrix to link a possible threat with each of the at least one components; determine a mean failure cost as a function of the generated matrices; analyze the mean failure cost to determine a control strategy; and a communication component in communication with the processor and the memory, the communication component configured to communicate the control strategy to a component operable within the control system, wherein the component implements the control strategy. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A method for implementing an econometrics-based control system, the method comprising:
-
generating a stakes matrix to determine a stake at least one stakeholder has in at least one system requirements; generating a dependency matrix to link a status of at least one component with each of the at least one system requirements; generating an impact matrix to link a possible threat with each of the at least one components; determining a mean failure cost as a function of the generated matrices; analyzing the mean failure cost to determine a control strategy; and communicating the control strategy to a component operable within the control system, wherein the component implements the control strategy. - View Dependent Claims (7, 8, 9, 10)
-
-
11. A device for implementing an econometrics-based control system, the device comprising:
-
a processor; a memory in communication with the processor, the memory configured to store processor implementable instructions, wherein the processor implementable instructions are programmed to; correlate a plurality of system requirements with each of a plurality of system stakeholders; identify a stake relating to each of the plurality of system stakeholders and the correlated plurality of system requirements, wherein the stake is identified by each of the plurality of system stakeholders; determine a mean failure cost as a function of the identified stake and a failure probability; analyze the mean failure cost to determine a control strategy; and a communication component in communication with the processor and the memory, the communication component configured to communicate the control strategy to a component operable within the control system, wherein the component implements the control strategy.
-
-
12. A method of implementing an econometrics-based control system, the method comprising:
-
identifying a plurality of system requirements; identifying a plurality of system stakeholders; defining a stake related to the interest of each of the plurality of system stakeholders in one of the plurality of system requirements; correlating the plurality of system requirements with each of the plurality of system stakeholders; assigning a failure probability to each of the identified plurality of system requirements; determining a mean failure cost as a function of the identified stake and the failure probability; analyzing the mean failure cost to determine a control strategy; and communicating the control strategy to a component operable within the control system, wherein the component implements the control strategy.
-
Specification