×

OPTIMIZING MULTIPLE BOILER PLANT SYSTEMS WITH MIXED CONDENSING AND NON-CONDENSING BOILERS

  • US 20100006042A1
  • Filed: 06/29/2009
  • Published: 01/14/2010
  • Est. Priority Date: 07/10/2008
  • Status: Active Grant
First Claim
Patent Images

1. A control system for a multiple boiler plant with mixed condensing and non-condensing boilers comprising:

  • separating a plurality of boilers into condensing and non-condensing groups,setting a system threshold to select which of said groups shall serve as lead boiler group for a selected boiler operating condition,said system threshold comprising settable parameters relating to the operation of said boiler plant,said settable parameters being entered into a system control unit to be stored therein,operating condition sensors to provide sensed operating condition data derived from the operating conditions of said boiler plant,said system control unit comprising comparator means to compare said settable parameters with said operating condition data, andsaid system control unit selecting from said groups of boilers to control which group shall be the lead group in response to a control signal provided by said comparator means.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×