ELECTRIC POWER SYSTEM
First Claim
1. An electric power system in which a plurality of electric power suppliers and demanders is mutually connected, the electric power supplier and demander being provided with one or a plurality of power generation devices, one or a plurality of electrical storage devices and one or a plurality of electric power consumption devices, and an electric power supply and demand control device,wherein each of said electric power supply and demand control devices judges whether or not electric power shortage is occurred or whether or not electric power surplus is occurred in each of said electric power suppliers and demanders provided with the electric power supply and demand control device, receives electric power from other electric power supplier and demander provided with said power generation device and/or said electrical storage device in the case where electric power shortage is occurred in the electric power supplier and demander, and controls to deliver electric power to other electric power supplier and demander in the case where electric power surplus is occurred in said electric power supplier and demander;
- andcontrols the plurality of said power generation devices in respective electric power suppliers and demanders in the delivery and receipt of electric power among respective electric power suppliers and demanders,the control being automatically or manually performed based on that a pattern classification model for a neural network is formed in a computer,total production of electricity, maximum electric power demand, and total electric power demand of the following day are predicted based on at least past actual performance data, weather forecast and calendar information of the following day, and theoretical amount of solar radiation at fine weather of the day,actual performance data of the forecast items and weather, calendar information, and theoretical amount of solar radiation of a past fixed period including at least the day are collected for neural network relearning,the relearning is performed by an error back propagation algorithm based on the prediction data and actual performance data of the day, andthe total production of electricity, the amount of maximum electric power demanded, and the amount of total electric power demanded of the following day are predicted by an updated neural network.
1 Assignment
0 Petitions
Accused Products
Abstract
In order to provide an electric power system in which a plurality of electric power suppliers and demanders is configured by being mutually connected by electric power supply and demand control devices, the electric power system being not only self-sustainable without depending on a known electric power system, but also capable of coexisting with the known electric power system; the electric power system is such configured that a plurality of electric power suppliers and demanders is mutually connected via an electric power supply and demand line (W), the electric power supplier and demander being provided with a power generation device 101, an electrical storage devices 102, a plurality of loads 103, and an electric power supply and demand control devices 104. The electric power supply and demand control device 51 judges whether or not electric power shortage is occurred or whether or not electric power surplus is occurred in the electric power supplier and demander 11 provided with the electric power supply and demand control device 51 based on data on total electric energy, the amount of maximum electric power demanded, and the amount of total electric power demanded of the following day in each electric power supplier and demander, predicted by a neural network; receives electric power from other electric power suppliers and demanders 12 to 15 provided with the power generation devices 101 and 151 and/or the electrical storage devices 102 and 152 in the case where electric power shortage is occurred in the electric power supplier and demander 11; and controls to deliver electric power to other electric power suppliers and demanders 12 to 15 in the case where electric power surplus is occurred in the electric power supplier and demander 11.
-
Citations
8 Claims
-
1. An electric power system in which a plurality of electric power suppliers and demanders is mutually connected, the electric power supplier and demander being provided with one or a plurality of power generation devices, one or a plurality of electrical storage devices and one or a plurality of electric power consumption devices, and an electric power supply and demand control device,
wherein each of said electric power supply and demand control devices judges whether or not electric power shortage is occurred or whether or not electric power surplus is occurred in each of said electric power suppliers and demanders provided with the electric power supply and demand control device, receives electric power from other electric power supplier and demander provided with said power generation device and/or said electrical storage device in the case where electric power shortage is occurred in the electric power supplier and demander, and controls to deliver electric power to other electric power supplier and demander in the case where electric power surplus is occurred in said electric power supplier and demander; - and
controls the plurality of said power generation devices in respective electric power suppliers and demanders in the delivery and receipt of electric power among respective electric power suppliers and demanders, the control being automatically or manually performed based on that a pattern classification model for a neural network is formed in a computer, total production of electricity, maximum electric power demand, and total electric power demand of the following day are predicted based on at least past actual performance data, weather forecast and calendar information of the following day, and theoretical amount of solar radiation at fine weather of the day, actual performance data of the forecast items and weather, calendar information, and theoretical amount of solar radiation of a past fixed period including at least the day are collected for neural network relearning, the relearning is performed by an error back propagation algorithm based on the prediction data and actual performance data of the day, and the total production of electricity, the amount of maximum electric power demanded, and the amount of total electric power demanded of the following day are predicted by an updated neural network. - View Dependent Claims (2, 3)
- and
-
4. An electric power system in which a plurality of electric power suppliers and demanders is mutually connected, the electric power supplier and demander being provided with at least one device selected from one or a plurality of power generation devices, one or a plurality of electrical storage devices and one or a plurality of electric power consumption devices, and an electric power supply and demand control device,
wherein said plurality of the electric power suppliers and demanders is sectioned into a plurality of groups; - and
said electric power supply and demand control device which belongs to each group judges whether or not electric power shortage is occurred or whether or not electric power surplus is occurred in the group; receives electric power from other group to which said electric power supplier and demander provided with said power generation device and/or said electrical storage device belongs in the case where electric power shortage is occurred in the group, and controls to deliver electric power to other group in the case where electric power surplus is occurred in the group; and controls the plurality of said power generation devices in said respective electric power suppliers and demanders of the respective groups in the delivery and receipt of electric power among the respective groups, the control being automatically or manually performed based on that a pattern classification model for a neural network is formed in a computer, total production of electricity, maximum electric power demand, and total electric power demand of the following day are predicted based on at least past actual performance data, weather forecast and calendar information of the following day, and theoretical amount of solar radiation at fine weather of the day, actual performance data of the forecast items and weather, calendar information, and theoretical amount of solar radiation of a past fixed period including at least the day are collected for neural network relearning, the relearning is performed by an error back propagation algorithm based on the prediction data and actual performance data of the day, and the total production of electricity, the amount of maximum electric power demanded, the amount of total electric power demanded of the following day are predicted by an updated neural network. - View Dependent Claims (5, 6, 7, 8)
- and
Specification