×

Time Integrated Guard Band

  • US 20100030392A1
  • Filed: 06/23/2009
  • Published: 02/04/2010
  • Est. Priority Date: 07/31/2008
  • Status: Active Grant
First Claim
Patent Images

1. An automated method of controlling a power managed system, the method comprising:

  • establishing a power consumption budget for a plurality of loads;

    defining an overbudget limit and an associated time window;

    monitoring power consumption of said plurality of loads;

    determining, at a plurality of time intervals over said associated time window, an indication of excess power consumption for each of said plurality of time intervals, said indication of excess power consumption being a function of said monitored power consumption and said defined power consumption budget; and

    in the event that an integral over said associated time window of a function of said determined indications of excess power consumption exceeds said overbudget limit, disabling at least one load from consuming power.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×