SYSTEM AND METHOD FOR OPTIMIZING MANUFACTURING WORKFORCE
First Claim
1. A method for facilitating the optimization of manufacturing workforce and reducing workforce boredom in an assembly plant having multiple assembling tasks and workers comprising the steps of:
- providing a first database of all of the workers assigned to work in the assembly plant;
providing a second database of all of the assembly tasks required to be performed at the assembly plant for a predetermined period;
providing a third database of repetitive task factors assigned to each of the tasks;
establishing a repetitive value threshold for each worker;
then processing the first database with the second database whereby each task is assigned a worker to generating a first schedule showing each particular assembly task and the personnel assigned thereto; and
thenprocessing the first, second, and third database so as to generate a second schedule assigning a worker to each of said tasks, wherein no worker exceeds the repetitive value threshold assigned to said worker.
1 Assignment
0 Petitions
Accused Products
Abstract
A method and system for optimizing the manufacturing workforce and reducing workforce boredom in an assembly plant is provided. A master database contains all the plant workers along with all of the assembly tasks required to be performed at the assembly plant for a predetermined period, a repetitive threshold value for each worker, and a burden value for each assembly task. Each worker is assigned to a particular assembly task based upon the attributes of the worker and the assembly task requirements. A first schedule is generated by matching assembly tasks to a worker. The first schedule is then used to generate a second schedule such that workers do not exceed a repetitive value threshold or a burden value threshold. Thus the method and system generates schedules such that workers are given a variety of assembly tasks and therefore are not bored by performing the same task repetitively.
50 Citations
11 Claims
-
1. A method for facilitating the optimization of manufacturing workforce and reducing workforce boredom in an assembly plant having multiple assembling tasks and workers comprising the steps of:
-
providing a first database of all of the workers assigned to work in the assembly plant; providing a second database of all of the assembly tasks required to be performed at the assembly plant for a predetermined period; providing a third database of repetitive task factors assigned to each of the tasks; establishing a repetitive value threshold for each worker;
then processing the first database with the second database whereby each task is assigned a worker to generating a first schedule showing each particular assembly task and the personnel assigned thereto; and
thenprocessing the first, second, and third database so as to generate a second schedule assigning a worker to each of said tasks, wherein no worker exceeds the repetitive value threshold assigned to said worker. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A system for optimizing manufacturing workforce and reducing workforce boredom in an assembly plant having multiple assembling tasks and personnel, said system comprising:
-
a database for storing a list of all workers assigned to the assembly plant, the list of all workers including the attributes of each worker, and a repetitive threshold value for each worker, and a list of all assembly tasks to be completed at the assembly plant, the list of all assembly tasks including the training and physical requirements, and a burden value of each assembly task; a computer processing unit in communication with said database, the computer processing unit executing a software application containing a scheduling algorithm;
the scheduling algorithm generating a first schedule assigning each identified assembly task to a worker matching the training and physical requirements of each assembly task to the attributes of each worker, generating a second schedule wherein no worker exceeds the repetitive value threshold assigned to said worker,an interface whereby a user may use the interface to modify a schedule showing the personnel assigned to assembly tasks; and an alert, whereby the alert is generated if a worker is assigned the same assembly task in the first and second schedule, or if the worker'"'"'s total burden value from the first schedule and second schedule exceeds a second predetermined total of burden values.
-
Specification