APPLICATION OF COST CONSTRAINTS IN EVENT SCHEDULING
First Claim
Patent Images
1. A method comprising:
- determining a cost metric associated with each of a plurality of calendar event parameters of a proposed calendar event;
determining a calendar event cost projection based upon, at least in part, the cost metric associated with each of the plurality of the calendar event parameters;
comparing the calendar event cost projection to a calendar event budget; and
selecting at least one of the plurality of calendar event parameters based upon, at least in part, the comparison of the calendar event cost projection to the calendar event budget.
1 Assignment
0 Petitions
Accused Products
Abstract
A cost metric is associated with each of a plurality of calendar event parameters of a proposed calendar event. A calendar event cost projection is determined based upon, at least in part, the cost metric associated with each of the plurality of the calendar event parameters. The calendar event cost projection is compared to a calendar event budget. At least one of the plurality of calendar event parameters is selected based upon, at least in part, the comparison of the calendar event cost projection to the calendar event budget.
137 Citations
18 Claims
-
1. A method comprising:
-
determining a cost metric associated with each of a plurality of calendar event parameters of a proposed calendar event; determining a calendar event cost projection based upon, at least in part, the cost metric associated with each of the plurality of the calendar event parameters; comparing the calendar event cost projection to a calendar event budget; and selecting at least one of the plurality of calendar event parameters based upon, at least in part, the comparison of the calendar event cost projection to the calendar event budget. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A computer program product residing on a computer readable medium having a plurality of instructions stored thereon which, when executed by a processor, cause the processor to perform operations comprising:
analyzing a cost metric for one or more calendar event parameters, wherein the one or more calendar event parameters include one or more of a number of event invitees, an event type, an event time and an event location; determining a cost metric associated with each of a plurality of calendar event parameters of a proposed calendar event; determining a calendar event cost projection based upon, at least in part, the cost metric associated with each of the plurality of the calendar event parameters; comparing the calendar event cost projection to a calendar event budget; and selecting at least one of the plurality of calendar event parameters based upon, at least in part, the comparison of the calendar event cost projection to the calendar event budget. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
15. A computing system comprising:
-
at least one processor; at least one memory architecture coupled with the at least one processor; a first software module executed on the at least one processor and the at least one memory architecture, wherein the first software module is configured to determine a cost metric associated with each of a plurality of calendar event parameters of a proposed calendar event; a second software module executed on the at least one processor and the at least one memory architecture, wherein the second software module is configured to determine a calendar event cost projection based upon, at least in part, the cost metric associated with each of the plurality of the calendar event parameters; a third software module executed on the at least one processor and the at least one memory architecture, wherein the third software module is configured to compare the calendar event cost projection to a calendar event budget; and a fourth software module executed on the at least one processor and the at least one memory architecture, wherein the fourth software module is configured to select at least one of the plurality of calendar event parameters based upon, at least in part, the comparison of the calendar event cost projection to the calendar event budget. - View Dependent Claims (16, 17, 18)
-
Specification