MANAGEMENT OF MATERIALS ON A CONSTRUCTION SITE
First Claim
Patent Images
1. A computer implemented method for management of materials on a construction site, said method comprising:
- defining at least one cost scenario to move at least one material with a vehicle pool;
determining a status of a project which uses the at least one material; and
generating a report which identifies a vehicle of said vehicle pool and defines a load of the material which is to be moved by said vehicle from a first location to a second location.
1 Assignment
0 Petitions
Accused Products
Abstract
A computer implemented method and computer system for management of materials on a construction site. In one embodiment, at least one cost scenario is defined for moving at least one material with a vehicle pool. A status of a project which uses the material is then determined. A report is generated which identifies a vehicle of the vehicle pool and defines a load of the material which is to be moved by the vehicle from a first location to a second location.
16 Citations
32 Claims
-
1. A computer implemented method for management of materials on a construction site, said method comprising:
-
defining at least one cost scenario to move at least one material with a vehicle pool; determining a status of a project which uses the at least one material; and generating a report which identifies a vehicle of said vehicle pool and defines a load of the material which is to be moved by said vehicle from a first location to a second location. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. A computer implemented system for managing an asset on a construction site, said system comprising:
-
a cost scenario generator configured to define at least one cost scenario to move a material with a vehicle pool; a status determiner configured to determine the status of a project which uses the material; and a report generator configured to generate a report which identifies a vehicle of said vehicle pool and defines which load of the material is to be moved by said vehicle from a first location to a second location. - View Dependent Claims (14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24)
-
-
25. A computer implemented method for asset management of a material on a construction site, said method comprising:
-
defining the cost to move a material from a first location to a second location based upon the availability of a plurality of vehicles of a vehicle pool; identifying said first location of the material and said second location of the material based upon a current status of said project and a desired status of said project; and generating a report which defines a load of the material and a vehicle of said plurality of vehicles which is used to move said load of the material from said first location to said second location. - View Dependent Claims (26, 27, 28, 29, 30, 31, 32)
-
Specification