Method for mapping downlink dedicated pilots to resource elements in extended cyclic prefix frame structure
First Claim
1. A method for mapping downlink dedicated pilots to resource elements in Extended Cyclic Prefix (Extended CP) frame structure, applied in a Long Term Evolution (LTE) system, comprising the following steps:
- mapping the first downlink dedicated pilot of each port to the specific position of a physical resource block;
mapping-processing other downlink dedicated pilots of the port according to the time-domain interval, frequency-domain interval and the preset regulation; and
the time-domain interval being two or three Orthogonal Frequency Division Multiplexing symbols, and the frequency-domain interval being two subcarriers in the same time domain.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for mapping downlink dedicated pilot frequencies of an extend cyclic prefix frame structure to physical resource blocks, applied in a long term evolution system, includes the following steps: the first downlink dedicated pilot frequency of each channel is mapped to the specific position of a physical resource block; other downlink dedicated pilot frequencies of the channel are mapping-processed according to the time domain interval, frequency domain interval and the preset regulation; the time domain interval is two or three OFDM symbols, the frequency domain interval is two sub-carriers of the same time domain. By defining the positions of pilot frequencies in the physical resource block, the public pilot frequency can obtain the information of all channels when a base station uses a beam pattern of more than four antennas. Making the channel information obtained by dedicated pilot frequencies contain the real channel information and the process-weight-value of a beam pattern, a UE does not need to obtain the transmission-weight-value of a beam pattern, such as to avoid the feedback cost of weight-values of a beam pattern.
106 Citations
13 Claims
-
1. A method for mapping downlink dedicated pilots to resource elements in Extended Cyclic Prefix (Extended CP) frame structure, applied in a Long Term Evolution (LTE) system, comprising the following steps:
-
mapping the first downlink dedicated pilot of each port to the specific position of a physical resource block; mapping-processing other downlink dedicated pilots of the port according to the time-domain interval, frequency-domain interval and the preset regulation; and the time-domain interval being two or three Orthogonal Frequency Division Multiplexing symbols, and the frequency-domain interval being two subcarriers in the same time domain. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13)
-
Specification