×

COLLECTING UTILITY DATA INFORMATION AND CONDUCTING RECONFIGURATIONS, SUCH AS DEMAND RESETS, IN A UTILITY METERING SYSTEM

  • US 20100176967A1
  • Filed: 01/04/2008
  • Published: 07/15/2010
  • Est. Priority Date: 01/04/2007
  • Status: Abandoned Application
First Claim
Patent Images

1. At a utility data collector configured for remotely collecting utility data from one or more endpoints that include a utility meter, a method comprising:

  • receiving a one-way type communication message from the endpoint, wherein the endpoint and the utility data collector are configured to communicate with each other using both one-way and two-way communications;

    based on receiving the one-way type communication message, performing a received signal strength indicator (RSSI) test to determine an adequacy of a communication link to be established between the endpoint and the utility data collector; and

    if a threshold is met for the RSSI test, initiating two-way communications between the endpoint and the utility data collector to gather at least utility consumption data.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×