Operational signal system and signal light arrangement
First Claim
Patent Images
1. A signal system for use in directing a supply vehicle delivering material to a self-propelled machine requiring such material, the signal system comprising:
- (a) a “
stop”
signal light;
(b) a “
proceed”
signal light; and
(c) a hoist control signal light set, including;
(i) a “
raise”
signal light; and
(ii) a “
lower”
signal light, the signal lights all being mounted on a primary display unit.
1 Assignment
0 Petitions
Accused Products
Abstract
A visual signal system including a signal display carried prominently on a paving machine, where it can be seen clearly by an operator of a dump truck or shuttle vehicle delivering paving material to the paving machine, as well as by other nearby personnel. Control circuits provide that a paving machine operator may separately control the display of certain signals, while other signals are automatically presented on the signal display in response to operation of paving machine functional controls.
30 Citations
28 Claims
-
1. A signal system for use in directing a supply vehicle delivering material to a self-propelled machine requiring such material, the signal system comprising:
-
(a) a “
stop”
signal light;(b) a “
proceed”
signal light; and(c) a hoist control signal light set, including; (i) a “
raise”
signal light; and(ii) a “
lower”
signal light, the signal lights all being mounted on a primary display unit. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15)
-
-
16. In combination with a self-propelled paving machine, signal display apparatus comprising:
-
(a) a primary signal display mounted on said paving machine and including a “
stop”
signal, a “
proceed”
signal, and a “
material off-load”
signal set;(b) a signal controller located at an operator station of the paving machine so as to be within reach of an operator of the paving machine and, said signal controller including a plurality of switches connected electrically to cause the display panel to show a selected one of said “
stop,”
“
proceed,” and
“
material off-load”
signals. - View Dependent Claims (17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28)
-