×

STRUCTURAL FLANGE CONNECTION SYSTEM AND METHOD

  • US 20100307097A1
  • Filed: 05/20/2010
  • Published: 12/09/2010
  • Est. Priority Date: 06/09/2009
  • Status: Active Grant
First Claim
Patent Images

1. A method of manufacturing a wind turbine tower with a structural flange connection, comprising the steps of:

  • aligning a first tower section and a second tower section to form at least part of the wind turbine tower, where the first tower section has at least one end terminating in a first structural flange, the second tower section has at least one end terminating in a second structural flange, and the first structural flange is proximate to and aligns with the second structural flange when the first tower section is aligned with the second tower section;

    forming a mechanical bond between the first structural flange and the structural second flange; and

    bolting the first structural flange and the second structural flange together.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×