×

METHOD AND SYSTEM FOR MANAGING CHARGE OF AUTOMATED GUIDED VEHICLE

  • US 20100308769A1
  • Filed: 12/15/2008
  • Published: 12/09/2010
  • Est. Priority Date: 01/31/2008
  • Status: Active Grant
First Claim
Patent Images

1. A method for managing charge of automated guided vehicles that manages charge of each of a plurality of automated guided vehicles circulating, driven by power of a battery, on a loop-shaped main route provided with an automatic charge station therein, the method comprising:

  • a first step of detecting, using the automated guided vehicle, a marker for battery voltage check provided in a desired position on the main route to measure the voltage of the battery built into the automated guided vehicle;

    a second step of changing the route of the automated guided vehicle to advance it into a charge route provided in the automatic charge station, stopping the automated guided vehicle in a predetermined charging position, and charging the battery of the automated guided vehicle automatically by using an automatic charger, if the battery voltage measured in the first step has lowered to a level requiring charging; and

    a third step of conveying the automated guided vehicle that has been automatically charged in the second step to a fully-charged AGV standby place the automated guided vehicle with charged battery provided in the automatic charge station, to make the automated guided vehicle stand by at the standby place, and restoring the automated guided vehicle with charged battery that is waiting at the standby place back to the main route,wherein the automatic charge station is provided with the plurality of automatic chargers;

    in the second step, the automated guided vehicle that has changed the route so as to advance into the charge route is adapted to stop at the charging position of the automatic chargers that are not in use among the plurality of the automatic chargers, so that battery of the automated guided vehicle is automatically charged with the unused automatic charger; and

    in the third step, in case that the automated guided vehicle with charged battery is not placed at the standby place, and there are the plurality of the automated guided vehicles during charge at the plurality of automatic chargers, the automated guided vehicles that need more time for charge than the others will advance first, andwherein the automated guided vehicle is of a tractor type optionally separated from or connected to a conveying carriage, and the automated guided vehicle is separated from the conveying carriage when advanced by changing a route from the main route into the charge route, andthe automated guided vehicle to be restored back to the main route is connected to the conveying carriage left on the main route and returned to normal travel along the main route.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×