×

INTEGRATED WORK LISTS FOR ENGINEERING PROJECT CHANGE MANAGEMENT

  • US 20100313179A1
  • Filed: 06/05/2009
  • Published: 12/09/2010
  • Est. Priority Date: 06/05/2009
  • Status: Active Grant
First Claim
Patent Images

1. A system comprising:

  • at least one logical processor;

    a memory in operable communication with the at least one logical processor;

    a display device;

    implementation components which encode in a portion of the memory implementation details of a current implementation of an engineering project;

    a current design diagram in a portion of the memory, the current design diagram representing a current design of the engineering project, the current design diagram including at least two design elements, each of these design elements having a visual representation in the display device, each of these design elements also having a link to at least one implementation component;

    a proposed design diagram in a portion of the memory, the proposed design diagram representing a proposed design of the engineering project and versioned separately from the current design diagram; and

    a work list in a portion of the memory, the work list including tasks for transforming the current design into the proposed design of the engineering project.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×