×

SYSTEM FOR TESTING POWER SUPPLY UNIT

  • US 20100315749A1
  • Filed: 09/11/2009
  • Published: 12/16/2010
  • Est. Priority Date: 06/11/2009
  • Status: Active Grant
First Claim
Patent Images

1. A system for testing a power supply unit comprising:

  • a test sub-system for performing test and recording test results; and

    a test control sub-system connected to the test sub-system and the power supply unit, the test control sub-system capable of selecting test items to test the power supply unit and setting an execution sequence of the test items;

    wherein the test items comprises a standby test item for testing the power supply unit at a standby state, a normal test item for testing the power supply unit at a normal state, and an over temperature protection test item for testing the power supply unit at an over heated state;

    the test control sub-system is capable of automatically switching the standby test item to the normal test item after a first predetermined time period for executing the standby test item, and switching the normal test item to the over temperature protection test item after a second predetermined time period for executing the normal test item.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×