Method for the Installation of Slab Tracks in Twin Tube Tunnels
First Claim
1. Method for the installation of slab tracks in twin tube tunnels aimed at carrying out an installation of a single track on slabs in each one of the tubes of a twin tube tunnel, comprising a series of working stages carried out in sequential order in each one of the tunnel tubes, and which comprises:
- (a) determination of the construction section;
(b) construction of the railway yards;
(c) assembly of auxiliary track in the maintenance lane;
(d) stocking of the sleepers on the evacuation platform;
(e) construction of the foundation base;
(f) assembly of the slab track;
(g) transitions of slab track—
ballast; and
(h) provision of long bars and welding.
1 Assignment
0 Petitions
Accused Products
Abstract
A method is described for the installation of slab tracks in tunnels, in particular tracks on a slab of concrete, with the optimised design and execution characteristics, and substantially increased performance compared to the normal known methods. The method includes a succession of phases executed in order, with the help of an auxiliary track, Consisting of the design of the construction section, the construction of the railway yards, assembly of the auxiliary track from the evacuation platform, execution of the foundation base, assembly of the track in slabs, transitions from slab track—ballast track, and placement of long bars and welding.
22 Citations
14 Claims
-
1. Method for the installation of slab tracks in twin tube tunnels aimed at carrying out an installation of a single track on slabs in each one of the tubes of a twin tube tunnel, comprising a series of working stages carried out in sequential order in each one of the tunnel tubes, and which comprises:
-
(a) determination of the construction section; (b) construction of the railway yards; (c) assembly of auxiliary track in the maintenance lane; (d) stocking of the sleepers on the evacuation platform; (e) construction of the foundation base; (f) assembly of the slab track; (g) transitions of slab track—
ballast; and(h) provision of long bars and welding. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14)
-