SMART BUILDING MANAGER

  • US 20100324962A1
  • Filed: 06/21/2010
  • Published: 12/23/2010
  • Est. Priority Date: 06/22/2009
  • Status: Active Grant
First Claim
Patent Images

1. A building manager comprising:

  • a communications interface configured to receive information from a smart energy grid;

    an integrated control layer configured to receive inputs from and to provide outputs to a plurality of building subsystems, the integrated control layer including a plurality of control algorithm modules configured to process the inputs and to determine the outputs;

    a fault detection and diagnostics layer configured to use the inputs received from the integrated control layer to detect and diagnose faults;

    a demand response layer configured to process the information received from the smart energy grid to determine adjustments to the plurality of control algorithms of the integrated control layer.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×