Load Shedding By An Electric Utility
First Claim
1. A method of load shedding by an electric utility, the electric utility capable of providing electricity to one or more power distribution systems organized into one or more substations, at least one power distribution system in at least one substation comprising a distributed renewable generation (‘
- DRG’
) system, the DRG system capable of providing power to the electric utility, a local load, and one or more batteries for storage, each power distribution system connected for data communications through a data communications network to the electric utility, the method comprising;
querying, by the electric utility, a plurality of power distribution systems that include a DRG system for present power consumption of the local load of the power distribution system;
selecting, in dependence upon the present power consumption of the local load of the plurality of power distribution systems and predefined power consumption criteria for each substation, a substation to receive a reduction in power; and
reducing power provided to the selected substation.
1 Assignment
0 Petitions
Accused Products
Abstract
Load shedding by an electric utility, including querying power distribution systems that include a DRG system for present power consumption of the local load of the power distribution system; selecting, in dependence upon the present power consumption of the local load of the power distribution systems and predefined power consumption criteria for each substation, a substation to receive a reduction in power; and reducing power provided to the selected substation.
-
Citations
20 Claims
-
1. A method of load shedding by an electric utility, the electric utility capable of providing electricity to one or more power distribution systems organized into one or more substations, at least one power distribution system in at least one substation comprising a distributed renewable generation (‘
- DRG’
) system, the DRG system capable of providing power to the electric utility, a local load, and one or more batteries for storage, each power distribution system connected for data communications through a data communications network to the electric utility, the method comprising;querying, by the electric utility, a plurality of power distribution systems that include a DRG system for present power consumption of the local load of the power distribution system; selecting, in dependence upon the present power consumption of the local load of the plurality of power distribution systems and predefined power consumption criteria for each substation, a substation to receive a reduction in power; and reducing power provided to the selected substation. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
- DRG’
-
9. An apparatus for load shedding by an electric utility, the electric utility capable of providing electricity to one or more power distribution systems organized into one or more substations, at least one power distribution system in at least one substation comprising a distributed renewable generation (‘
- DRG’
) system, the DRG system capable of providing power to the electric utility, a local load, and one or more batteries for storage, each power distribution system connected for data communications through a data communications network to the electric utility, the apparatus comprising a computer processor, a computer memory operatively coupled to the computer processor, the computer memory having disposed within it computer program instructions capable of;querying, by the electric utility, a plurality of power distribution systems that include a DRG system for present power consumption of the local load of the power distribution system; selecting, in dependence upon the present power consumption of the local load of the plurality of power distribution systems and predefined power consumption criteria for each substation, a substation to receive a reduction in power; and reducing power provided to the selected substation. - View Dependent Claims (10, 11, 12)
- DRG’
-
13. A method of participating in electric utility load shedding, the electric utility capable of providing electricity to one or more power distribution systems organized into one or more substations, at least one power distribution system in each substation comprising a distributed renewable generation (‘
- DRG’
) system, the DRG system capable of providing power to the electric utility, a local load, and one or more batteries for storage, each power distribution system connected for data communications through a data communications network to the electric utility, the method comprising;receiving from the electric utility, by a control engine of a power distribution system that includes a DRG system, a query for present power consumption of the local load of the power distribution system; determining whether a present state of charge of the one or more batteries of the power distribution system is greater than a predetermined threshold; and responding to the electric utility'"'"'s query with the present power consumption of the local load only if the present state of charge of the one or more batteries of the power distribution system is greater than the predetermined threshold. - View Dependent Claims (14, 15, 16)
- DRG’
-
17. An apparatus for participating in electric utility load shedding, the electric utility capable of providing electricity to one or more power distribution systems organized into one or more substations, at least one power distribution system in each substation comprising a distributed renewable generation (‘
- DRG’
) system, the DRG system capable of providing power to the electric utility, a local load, and one or more batteries for storage, each power distribution system connected for data communications through a data communications network to the electric utility, the apparatus comprising a computer processor, a computer memory operatively coupled to the computer processor, the computer memory having disposed within it computer program instructions capable of;receiving from the electric utility, by a control engine of a power distribution system that includes a DRG system, a query for present power consumption of the local load of the power distribution system; determining whether a present state of charge of the one or more batteries of the power distribution system is greater than a predetermined threshold; and responding to the electric utility'"'"'s query with the present power consumption of the local load only if the present state of charge of the one or more batteries of the power distribution system is greater than the predetermined threshold. - View Dependent Claims (18, 19, 20)
- DRG’
Specification