×

Manufacturing Resource Planning using a Component Management System

  • US 20110029120A1
  • Filed: 07/31/2009
  • Published: 02/03/2011
  • Est. Priority Date: 07/31/2009
  • Status: Active Grant
First Claim
Patent Images

1. A computer-implemented method for component management based on production planning, the method comprising:

  • receiving, in a computer system, order information for a first order to be executed using the computer system to assemble a first product from a plurality of components at a manufacturing location;

    updating a real-time record with the order information, the real-time record associated with the manufacturing location and being kept updated substantially in real time with order changes, the real-time record associating the first order with the plurality of components;

    determining, for each of the plurality of components, whether a component change due to the order information meets a component-specific change criterion associated with the component;

    updating a static record with the component change for any of the plurality of components required for the first order where the component-specific change criterion is met; and

    initiating, after the static record is updated, a management process regarding the plurality of components for the manufacturing location, the management process configured to manage supply of at least one of the plurality of components according to the static record.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×