Project management system, project management center device used for the same, terminal device, project management center device program, terminal device program, and electronic medical record management system
First Claim
1. A project management system for managing act information in a project on time-line, the project management system comprising:
- an act information storage unit configured to store a plurality of act information which includes at least linkage information which comprises an applicable condition for an own act and other acts to have a relevance for the every performed act;
an act information acquiring unit configured to acquire the act information which is selected from the plurality of act information stored in the act information storage unit;
an act information arrangement unit configured to arrange the act information on the time-line information based on direction from the outside, respectively, wherein the act information has time-line information and the act information is acquired by the act information acquiring unit;
an act information detecting unit configured to detect mutually other act information to which the linkage information included in the concerned act information is applied, among the act information arranged by the act information arrangement unit on the time-line information; and
an output information generation unit configured to output information is generated based on a resulting detection processing in the act information detecting unit.
1 Assignment
0 Petitions
Accused Products
Abstract
It is possible to provide a project management system and a project management system program for supporting effective building and management of a project by considering relationship among actions executed in a project management. For example, an electronic medical report system (1) includes an electronic medical record management center device (10) for managing information on a medical action executed on a medical site which device is connected via a network (30) to a plurality of terminal devices (20) used by users. The electronic medical record management center device (10) has linkage information for linking to other medical action for each of the medical actions. The terminal devices (20) generate electronic medical records by considering the relationship among the medical actions according to the linkage information.
-
Citations
22 Claims
-
1. A project management system for managing act information in a project on time-line, the project management system comprising:
-
an act information storage unit configured to store a plurality of act information which includes at least linkage information which comprises an applicable condition for an own act and other acts to have a relevance for the every performed act; an act information acquiring unit configured to acquire the act information which is selected from the plurality of act information stored in the act information storage unit; an act information arrangement unit configured to arrange the act information on the time-line information based on direction from the outside, respectively, wherein the act information has time-line information and the act information is acquired by the act information acquiring unit; an act information detecting unit configured to detect mutually other act information to which the linkage information included in the concerned act information is applied, among the act information arranged by the act information arrangement unit on the time-line information; and an output information generation unit configured to output information is generated based on a resulting detection processing in the act information detecting unit. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A project management center device for managing information about an act performed in a project, the project management center device comprising:
-
an act information storage unit configured to store a plurality of act information which includes at least linkage information which comprises an applicable condition for an own act and other acts to have a relevance for every performed act; and a project information record unit configured to store project information created with arranging the act information on time-line information. - View Dependent Claims (7, 8)
-
-
9. A terminal device connected to a project management center device for managing project information about an act performed in a project through a network, the terminal device being used by a user, the terminal device comprising:
-
an act information acquiring unit configured to acquire selected act information through the network from a plurality of act information, wherein the plurality of act information is stored on the project management center device and includes at least linkage information which comprises applicable conditions for an own act and other acts to have a relevance for every performed act; an act information arrangement unit configured to arrange the act information on the time-line information based on direction from the outside, respectively, wherein the act information has time-line information and the act information is acquired by the act information acquiring unit; an act information detecting unit configured to detect mutually other act information to which the linkage information included in the act information is applied, among the concerned act information arranged by the act information arrangement unit on the time-line information; and an output information generation unit configured to output information is generated based on a resulting detection processing in the act information detecting unit. - View Dependent Claims (10, 11, 12, 13, 14)
-
-
15. A project management center device program for achieving a plurality of functions to a project management center device for managing project information about an act performed in a project, the program comprising:
-
an act information memory function for storing a plurality of act information which includes at least linkage information which comprises an applicable conditions for an own act and other acts to have a relevance for every performed act; and a project storing function for storing the project information created with arranging the act information on the time-line.
-
-
16. A terminal device program for achieving a plurality of functions to a terminal device connected to a project management center device for managing information of an act performed in a project through a network, the terminal device is used by a user, the program comprising:
-
an act information acquisition function for acquiring selected act information through the network from a plurality of act information, wherein the plurality of act information is stored on the project management center device and includes at least linkage information which comprises applicable conditions for an own act and other acts to have a relevance for every performed act; an act information arrangement function for arranging the act information on the time-ling information based on direction from the outside, respectively, wherein the act information has time-line information and the act information is acquired by the act information acquisition function; an act information detection function for detecting mutually other act information to which the linkage information included in the concerned act information is applied among the act information arranged by the information arrangement function on the time-line information; and an output information generation function for generating output information based on a resulting detection processing by the act information detection function. - View Dependent Claims (17, 18, 19, 20, 21)
-
-
22. An electronic medical record management system for managing information about a medical action on time-line, the electronic medical record management system comprising:
-
a medical action information storage unit configured to store a plurality of medical action information which includes at least linkage information which comprises applicable conditions for an own medical action and other medical actions to have a relevance is recorded for every medical action; a medical action information acquisition unit configured to acquire the medical action information which is selected from a plurality of the medical action information stored in the medical action information storage unit; a medical action arrangement unit configured to arrange the medical action information on the time-axis information based on direction from the outside, respectively, wherein the act information has time-line information and the act information is acquired by the medical action information acquisition unit; a medical action information detecting unit configured to detect mutually other medical action information that the linkage information included in the concerned medical action information is applied, among the medical action information arranged by the medical action arrangement unit on the time-line information; and an output information generation unit configured to output information is generated based on a resulting detection processing in the medical action information detecting unit.
-
Specification