×

Managing Planning of Component Requirements

  • US 20110029345A1
  • Filed: 07/31/2009
  • Published: 02/03/2011
  • Est. Priority Date: 07/31/2009
  • Status: Abandoned Application
First Claim
Patent Images

1. A computer program product tangibly embodied in a computer-readable storage medium and comprising instructions that when executed by a processor perform a method for managing planning of component requirements, the method comprising:

  • providing a system for a product manufacturing enterprise having a central location and multiple manufacturing plants at different locations, the system comprising a central computer device at the central location and respective manufacturing computer devices for each of the multiple manufacturing plants;

    maintaining, in the central computer device, a BOM for a plurality of product types manufactured at the multiple manufacturing plants, the BOM defining that each of the product types belongs to a platform design and comprises at least (i) a first component common to all of the products types and (ii) a second component not common to all of the product types;

    forwarding, from the BOM, first-component data regarding the first component of the product types to a central planning unit in the central computer device, the central planning unit being configured to generate a central plan for managing planning for the first component;

    forwarding, from the BOM, second-component data regarding the second component of each of the product types to local planning units in the manufacturing computer devices, each of the local planning units being configured to generate a local plan for managing planning for the second component used by the corresponding manufacturing plant; and

    causing the first and second components to be purchased for use by the product manufacturing enterprise according to the central plan and the local plan.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×