SAFETY SYSTEM AND METHOD OF AN UNDERGROUND MINE
First Claim
1. A method of safety of a mine structure, comprising:
- expediting an air extraction process from an emergency support system by including a RIC (rapid interventions company/crew)/UAC (universal air connection) fitting to a fill panel to fill a breathable air apparatus.
1 Assignment
0 Petitions
Accused Products
Abstract
Disclosed are a safety system and method of an underground mine. In one embodiment, a method of safety of a mine structure includes expediting an air extraction process from an emergency support system by including a RIC (rapid interventions company/crew)/UAC (universal air connection) fitting to a fill panel to fill a breathable air apparatus. The method may include ensuring that a prescribed pressure of the emergency support system maintains within a threshold range of the prescribed pressure by including a valve of the emergency support system to prevent leakage of breathable air from the emergency support system. The method may also include maintaining the prescribed pressure of the emergency support system such that a system pressure is compatible with a breathable air apparatus through a distribution structure that is rated for use with compressed air.
23 Citations
25 Claims
-
1. A method of safety of a mine structure, comprising:
expediting an air extraction process from an emergency support system by including a RIC (rapid interventions company/crew)/UAC (universal air connection) fitting to a fill panel to fill a breathable air apparatus. - View Dependent Claims (2, 3, 4, 5)
-
6. A method of safety of a mine structure, comprising:
facilitating a flow of air from an emergency support system by including a RIC (rapid interventions company/crew)/UAC (universal air connection) fitting to a fill location to fill a breathable air apparatus. - View Dependent Claims (7, 8, 9, 10)
-
11. A method of safety of a mine structure, comprising:
extracting breathable air from an emergency support system by including a RIC (rapid interventions company/crew)/UAC (universal air connection) fitting to a fill location to fill a breathable air apparatus. - View Dependent Claims (12, 13, 14, 15)
-
16. A method of safety of a mine structure, comprising:
safeguarding a filling process of a breathable air apparatus by enclosing the breathable air apparatus in a secure chamber of a fill site of the emergency support system of the building structure to provide a safe placement to supply the breathable air to the breathable air apparatus. - View Dependent Claims (17, 18, 19, 20)
-
21. A method of safety of a mine structure, comprising:
safeguarding a filling process of a breathable air apparatus by enclosing the breathable air apparatus in a secure device of a fill site of the emergency support system of the building structure to provide a safe placement to supply the breathable air to the breathable air apparatus. - View Dependent Claims (22, 23, 24, 25)
Specification