Please download the dossier by clicking on the dossier button x
×

TECHNOLOGY REPLACEMENT COST ESTIMATION USING ENVIRONMENTAL COST CONSIDERATIONS

  • US 20110035243A1
  • Filed: 08/10/2009
  • Published: 02/10/2011
  • Est. Priority Date: 08/10/2009
  • Status: Active Grant
First Claim
Patent Images

1. A method of estimating a replacement cost associated with an existing technology, said method comprising steps performed by a processor of:

  • obtaining one or more costs associated with implementing the existing technology, wherein the one or more costs include an environmental cost and a utility cost associated with implementing the existing technology; and

    calculating an existing net benefit of continuing implementation of the existing technology based upon the obtained one or more costs.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×