×

System and Method for Managing Stakeholder Impact on Sustainability for an Organization

  • US 20110060616A1
  • Filed: 04/23/2010
  • Published: 03/10/2011
  • Est. Priority Date: 09/09/2009
  • Status: Active Grant
First Claim
Patent Images

1. A computer-implemented method for managing stakeholder impact on sustainability for an organization, the method comprising:

  • storing in one or more memory modules of a computer system a plurality of instances of a stakeholder object, each of the plurality of instances of the stakeholder object defining a plurality of characteristics of a stakeholder of the organization, at least five of the plurality of characteristics selected from the group consisting of;

    a description of the stakeholder;

    a category of the stakeholder;

    a description of a relationship with the stakeholder;

    an owner of the relationship with the stakeholder;

    a description of a stakeholder investment in the organization;

    a first indication of an extent to which a stakeholder interest actually aligns with an organizational interest;

    a second indication of an extent to which the stakeholder interest is optimally aligned with the organizational interest;

    a description of an approval power granted to the stakeholder;

    an importance rating of the stakeholder relationship from a perspective of the organization; and

    an anticipated effect of a sustainability project of the organization on the stakeholder relationship;

    establishing a computer-based logical link between at least one of the plurality of instances of the stakeholder object to at least one sustainability project of the organization, the at least one sustainability project of the organization stored in the one or more memory modules of the computer system;

    generating a progress report of the sustainability project of the organization using a computer unit;

    determining that a particular stakeholder of the organization is logically linked to the at least one sustainability project of the organization; and

    in response to the determination that the stakeholder is logically linked to the sustainability project of the organization, automatically transferring the progress report to the stakeholder of the organization, wherein the progress report is transferred in a desired format.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×